Home

 

 

 

SVB   SPIRAL BOWL SERIES

 

 

 

 

   SVB Literature

 

                              

  SPIRAL BOWL DESIGN

  FULL RANGE OF FINISHING ACTION

  HEAVY DUTY CONSTRUCTION

  100 % PART UNLOADING

  CAST URETHANE LINING

 

 

 

 

 

 

 

 

 

wpe8.jpg (15272 bytes)  SVB OPEN TOP UNLOADING.jpg (239314 bytes)   

   

The internal parts separation ramp (left photo) is underneath the media during the process cycle, and when engaged (right photo) either manually or by pneumatic cylinder, the ramp pivots up lifting both the abrasive media and parts to the separation screen deck. The media falls through the screen openings and the parts (gasoline pumps in the photo) automatically discharge out of the machine.

Home ]